Martes, Setyembre 3, 2019

From chronic to critical: what a ‘no-deal’ Brexit will mean for the skills crisis

The Government has confirmed that in the event of a ‘no-deal’ Brexit at the end of October, the UK will end EU free movement rules immediately. The cliff edge will be as sheer, and clear, as the White Cliffs of Dover, says Blane Perrotton, managing director of Naismiths.

No gradual phasing in, no grace period. While the Prime Minister insisted post-Brexit Britain will not become “hostile to immigration”, the prospect of an abrupt end to the rules which have for years allowed EU citizens to live and work in the UK has got many in the construction industry worried.

The reason is obvious to anyone who has set foot on a building site recently. Across the UK, every one in ten construction worker is an EU national. This figure rises to one in three in London.

Put simply, much of Britain’s construction sector relies on European workers – both skilled and unskilled.

The countdown to Brexit alone has been enough to deter many Europeans from coming here to work. Official migration data released recently showed that immigration from the EU has fallen steadily since the Brexit referendum. It’s now at its lowest level since 2013, and half the level seen in the 12 months leading up to the vote in June 2016.

True, this slowdown in immigration is partly due to booming job opportunities – and rising wages – in countries like Poland, which have encouraged many Polish workers to stay at home rather than seek work in Britain’s stagnating construction sector. But with many UK contractors already struggling to recruit and retain enough staff, the threat of an overnight halt in the supply of European talent is truly grim.

Of course importing workers was only ever a stop-gap, rather than a solution to UK construction’s endemic skills shortage.

The skills crisis predates Brexit, and its roots lie in a worryingly entrenched demographic shift: the number of young people coming into the industry has steadily failed to keep pace with the number of old hands retiring or leaving it. Construction has been allowed to develop a real image problem. A generation of British teenagers raised on – and aspiring to – Love Island has come to see construction work as dirty, dangerous and poorly paid.

The Government has recently made some encouraging noises about boosting the appeal of careers in construction among school-leavers by championing vocational training. In April it announced the creation of 12 Institutes of Technology, which will be centres of excellence for training in construction, manufacturing and transport. Next year it will introduce a new technical qualification, the T-level, which is pitched as a vocational equivalent to A-levels.

There have been regional initiatives too, like the Mayor’s Construction Academy in London – which supports training providers and aims to equip more people with the skills they need to work on the capital’s resi construction sites.

But we as an industry need to step up too, by re-engaging with young people and showing that construction can provide not just a well-paid and rewarding career, but also a chance to make a difference to both the fabric and the future of UK Plc. We must reach out to schools and government to combat the ‘hard hat, hi-vis’ stereotype, and work with them to encourage more bright young Britons to consider a career in construction.

None of these measures alone can provide a quick fix to a problem that has been years in the making. A coordinated combination of all of them will be required.

Against the current backdrop of thin order books, patchy developer demand and squeezed margins, it’s tempting to dismiss the skills issue as a problem to be tackled later. But a ‘no-deal’ Brexit could catapult UK construction’s lack of skilled workers from the chronic to the critical. If the free movement of EU workers ends on Halloween, the sticking plaster provided by imported labour will quickly be ripped off.

While the downturn in demand is a cyclical threat that the construction industry should take in its stride, the permanent loss of skilled workers poses a more insidious, yet more serious, danger. Failure to reverse this trend would relegate the Government’s target of building 300,000 new homes a year to the realms of fantasy, and do long-term damage to the industry’s capability.

With a ‘no-deal’ Brexit becoming more likely with each passing day, the final countdown to October 31st has become a burning platform moment for the construction skills crisis.

If we can no longer import our way out of the problem, we must dramatically improve the supply of homegrown talent, and the time to start is now.

If you would like to read more articles like this then please click here.

The post From chronic to critical: what a ‘no-deal’ Brexit will mean for the skills crisis appeared first on UK Construction Online.


Lunes, Setyembre 2, 2019

Encouraging generation Z into the construction industry

Generation Z is most commonly associated with those born between 1995 and 2010. They are the first generation who are unlikely to remember a time before the internet. They have grown up with an array of technology with connectivity 24/7.

As this generation enters the world of work, trying to entice them into the construction industry is a challenge as it’s highly likely that young people will be considering other industries as well. According to research compiled by Silver Swan Recruitment, 91% of Generation Z workers surveyed said that how technologically advanced an organisation is would impact on their decision to work there. Therefore, in order to attract their attention, it is important that employers within the construction industry use social media to advertise jobs and engage with young people who are looking to take their first steps into the workplace.

Boosting skills

UK Construction Week (UKCW), the UK’s largest event for the built environment, welcomes school and college groups to attend. The show takes place at the NEC in Birmingham between the 8th and 10th October 2019 and will offer a range of skill boosting initiatives.

Following the success of the UKCW Construction Role Models initiative last year, nominations quadrupled in 2019. From these, a shortlist of 99 people was drawn up.

All shortlisted Role Models are invited as VIPs to UKCW and given the opportunity to speak on the UKCW main stage and contribute to the show’s blog. They also take part in an outreach programme, going into colleges and schools to talk to students and teachers about what inspired them to choose construction as a career and to bust any myths around the image of construction.

A new feature at UKCW for 2019 is a Careers Centre, at which visitors can speak with UKCW’s Role Models, career advisors, recruitment firms, advisers from the Department of Work and Pensions, professional trade bodies and others about careers in construction or how to attract, recruit and retain talent in the industry.

Visitors will be able to try their hand at being a construction site manager courtesy of Coventry University. Its popular construction site simulator will be back for a second year. The simulator puts visitors through their paces as they try their hand at building site management. Large screens provide a highly immersive environment and specially-trained actors lead participants through real-life scenarios designed to improve soft skills and develop new ways of working.

George Clarke’s educational charity, MOBIE, has teamed up with the Construction Innovation Hub (the Hub) to inspire future designers. The Student Design Challenge asked students to design the ultimate 21st century house. They had to consider technology, affordability, size, space, family growth, sustainability, comfort, individuality and aesthetics. The winning design will be on display at UKCW.

To encourage young people into the construction sector the IBuiltThis competition is back, organised by the Finishes and Interiors Sector (FIS). The competition is broken into three age categories; 13 and under, 14 to 18 years old and 19 and over, this allows it to engage with a wide group of students all at different stages of education. The winners from each category will be announced at UKCW.

Mental health and wellbeing

As the stigma and barriers around mental health are being broken down and more public awareness is being raised young people are becoming more aware of their mental health.  Further research gathered by Silver Swan Recruitment highlighted that generation Z are likely to favour employers that offer strong mental health services.

According to Mind, one in four people in the UK will experience a mental health problem each year. That is why mental health is a key focus of UKCW this year.

Launching at UKCW this year, the Mind Your Head campaign is designed to promote mental wellbeing for those working in the construction industry. It is a straight-talking, no-nonsense and accessible way to reach this target audience. As part of the campaign, the Material Support exhibition will be on display at UKCW. The exhibition is designed to champion the importance of mental health in construction and will transform traditional building materials and manufacturer products into powerful works of art. Each featured artwork will be designed to carry a meaningful message related to mental wellbeing.

As part of the campaign, Carwyn Lloyd Jones, the creator of the Tiny House at last year’s UKCW will be using his talents to create an artistic installation of swings which has a mental health focus.

These initiatives at UKCW offer delegates the opportunity to explore the different options of mental health support, and how these can be implemented into businesses within the construction industry.

UK Construction Week is one event with many sections, including Build sponsored by Easy-Trim, Building Tech, Civils, Energy and HVAC, Surface and Materials, and Timber. It also features Concrete Expo (8th and 9th October only) and Grand Designs Live (9th and 10th October only). Single registration gives free access to all areas of the show. Pre-booking is also strongly recommended for the extensive seminars and CPD programme.

For further information and to register to attend visit: www.ukconstructionweek.com

Article submitted by Nathan Garnett, Event Director of UK Construction Week (UKCW).

The post Encouraging generation Z into the construction industry appeared first on UK Construction Online.


London Mayor visits Kier project site

The Mayor of London, Sadiq Khan, met with Kier Highways construction workers at the site of the Cycleway 4 project in Rotherhithe, London, taking a tour around project works at the Rotherhithe Roundabout.

The Cycleway 4 project aims to build a continuous segregated cycle route in East London, between Tower Bridge and Greenwich, with the addition of pedestrian crossings and improved public spaces as well, specifically operating within the boroughs of Bermondsey, Rotherhithe, Deptford and Greenwich.

Falling under the label of one of the contracts commissioned by the London Highways Alliance Contract, the Cycleway 4 project has been commissioned as a joint initiative between Transport for London (TfL) and various London Borough Councils in order to make cycle paths in the city clearer and safer.

The Mayor of London, Sadiq Khan stated: “I’m delighted that we are bringing forward construction on this latest segregated cycle way so that people can enjoy the benefits of this major new Cycleway route sooner.

“By creating new crossings and segregated routes we will make it safer and more convenient for many more Londoners to walk and cycle, which is crucial to clean up our toxic air. Expanding the Santander Cycles scheme to Bermondsey and Rotherhithe for the first time will provide a further boost for cycling in south east London.”

The scheme also falls under the Mayor’s Transport Strategy and Healthy Streets approach which encourages alternative modes of transport to cars to make London a cleaner city.

Kier undertook the project, which is one of the largest projects every to be undertaken by the business, in July 2019 while the schemes completion is not scheduled until the summer of 2020.

The Kier Highways Managing Director of Local Authorities, Mitesh Solanki added: “We are really pleased that Sadiq Khan could visit to see the fantastic work taking place on the Cycleway 4 project. He is an avid promotor for Healthy Streets, which aims to improve both the pedestrian and cycling environment around London.

“This is a scheme we’re very proud of and is fitting with Sadiq’s vision of having 70% of Londoners living within 400 metres of a high-quality cycle route by 2041. I continue to be very proud and impressed with the work being done by the teams working on site and back in the office in Tunnel Avenue.”

If you would like to read more articles like this then please click here.

The post London Mayor visits Kier project site appeared first on UK Construction Online.


Sellafield receives effluent containers

The construction of the new Sellafield nuclear waste disposal facility in Cumbria has reached the close of a two year process, within the wider construction project, following the delivery of two vessels which will manages the disposal of effluents.

The two vessels, or containers, were designed, manufactured, and tested by the company, Bendall’s Engineering, at their Carlisle manufacturing base and are now ready to be fitted at the Box Encapsulation Plant at Sellafield.

Sellafield Ltd.’s Box Encapsulation Plant joint delivery team specified the purpose and design needs of the vessels to Bendall’s before commissioning their manufacture so that the containers were safe and met the requirements of nuclear waste disposal.

The Project Manager at Sellafield Ltd, Ewan Smith stated: “This is an important milestone for the project and I’d like to congratulate everyone involved. These are complex vessels which will play an important role in the plant.

“They are designed to collect and sample highly active effluent so it can be safely transferred to the specialist facility that manages the material. Bendalls’ work on the project began with a relatively simple contract to provide vessels to deal with lower activity effluent. These were completed and installed some time ago.

“During that work, we gained valuable experience that informed the delivery of the more complex, larger vessels. It’s a great example of how long term collaborative relationships with our supply chain partners can deliver results for the Sellafield mission.”

The Sellafield nuclear waste disposal facility was designed to assist in the 100-year nuclear waste disposal programme which Britain has organised to handle radioactive waste following the decommissioning of four legacy waste plants.

Sellafield was initially meant to contain the waste from the Magnox Swarf Storage Silo but will now also manage waste from a further three legacy waste plants including: the First Generation Magnox Storage Pond, the Pile Fuel Storage Pond, and Pile Fuel Cladding Silo.

If you would like to read more articles like this then please click here.

The post Sellafield receives effluent containers appeared first on UK Construction Online.


Maesteg Town Hall secures regeneration funds

The town hall in Maesteg, Wales, is scheduled to receive £3.5M in funding from the Welsh Government and the European Union for aesthetic revitalisation and to make the building a cultural and community hub.

Funding will be spent on the creation of a new library service, improved meeting and conference space, a studio theatre, a children’s play area, superfast Wi-Fi, a new glass atrium, improved bar and catering facilities, an enhanced dressing room, and backstage facilities.

It is hoped that the new town hall will reflect the culture and history of the local area while also teaching children and adults new skills that will be useful to developing a sociable and integrated community.

The Deputy Housing and Local Government Minister, Hannah Blythyn stated: “This beautiful architecturally important building which has served the community for so long is getting a new lease of life, and I look forward to seeing it flourish and grow.

“It will enable local people to come together and act as the social heart of the Maesteg community. In addition to a range of innovative resources, it will provide spaces for increased learning and skill opportunities in conjunction with a variety of partners.”

The revitalisation project for the Maesteg Town Hall falls under the Building for the Future programme which aims to obtain and regenerate abandoned buildings and urban land across West Wales and the Valleys.

The funds for the project have come, in part, from the Building for the Future programme fund with the specific amounts of investment equalling £858,000 from the programme, a little over £2M in EU funding, and £650,000 from the Valleys Task Force.

The Council’s Cabinet Member for Education and Regeneration, Councillor Charles Smith concluded: “This is excellent news and I would like to thank Welsh Government and congratulate everyone who has helped deliver the successful bid for funding.

“It marks a major step forward in our plans to safeguard the future of this historic old building even as we look towards ensuring that it is fully equipped to meet the modern needs of the community here in Bridgend County Borough.”

If you would like to read more articles like this then please click here.

The post Maesteg Town Hall secures regeneration funds appeared first on UK Construction Online.


The state of the subcontracting industry: How can Bibby Financial Services help?

According to Bibby Financial Services’ expert data, published in their subcontractor growth report, the subcontracting industry in 2019 has suffered from the average contract pipeline shrinking by nearly a third.

What is the current state of the subcontracting industry?

At this moment in time, in the subcontracting industry, the amount of work which subcontractors normally receive through contracts per year has drastically decreased, with the average amount of work per year measuring at just 19 weeks in 2019 after having decreased from 27 weeks in 2018, displaying a radical eight week decline.

In fact, many companies have stated that the available contracts are shrinking, meaning that firms can no longer risk refusing certain contracts and thus potentially lose business which, in turn, gives subcontractor businesses less freedom to select the projects which best fit their company objectives.

The Managing Director of Construction Finance at Bibby Finance Services, Helen Wheeler stated: “There are many ongoing problems currently facing the subcontracting industry. A growing number of businesses are finding themselves with little room to manoeuvre when it comes to choosing contracts, with small businesses being the worst affected.”

Since the collapse of Carillion in January, the subcontracting industry has been experiencing volatility which has only been worsened by the continued uncertainties surrounding Brexit, only serving to increase the lack of confidence in the industry and while making subcontracts, themselves, more short-term.

What this has, essentially, caused within the industry as whole, is the hindrance of cash flow, business savings, and hiring, with almost one fifth of subcontractors choosing to deprioritise hiring and building up cash reserves.

How can Bibby Financial Services assist with contracts and finance?

Furthermore, expert data from Bibby Financial Services revealed that, in 2019, 48% of subcontractor companies found the actual contracts themselves ‘difficult to understand’, having risen from 44% in 2018 and dramatically increasing from the 38% proportion of companies which found this to be the case in 2016.

MD Wheeler commented: “Many subcontractors are now relying upon the support of construction finance firms such as Bibby Financial Services who are committed to helping subcontractors feel more secure and supported so that they may build solid foundations for their futures.

“Bibby Financial Services have been working with the industry for over ten years and have become one of the leading providers of financial solutions.”

Specifically, the company can provide subcontractors with the vital knowledge and support that is required on the financial side of the industry, including services such as invoice financing for SMEs, clarifying the complex jargon and clauses within contracts for clients, and can also pursue the necessary payments that subcontractors need to keep payments turning over.

MD Wheeler added: “BFS aims to provide the necessary support to subcontracting businesses through every step of the process.”

How can the state of the industry be improved?

Potential solutions, proposed by some subcontractors, include the necessity for stricter regulations, a more active input from the government to aid in the stabilisation of the subcontractor market, and priority being given to the delivery of larger contracts to the subcontractor industry.

Bibby Financial Services also revealed that 89% of subcontractors, nearly a unanimous verdict, agreed that the government should intervene in the state of the subcontractor market. However, there is a considerable degree of disagreement over the most effective method to stabilise the industry in the wake of all its current issues.

Perhaps the most popular suggested solution, quoted by subcontractors, was compulsory adherence to the Prompt Payment Code, which 74% of subcontractors recommended, whereas the second most popular solution was a greater distribution of large contracts to subcontractors, quoted by 62%, while the third most popular solution was the avoidance of EU tariffs, recommended by 55%.

If you want to learn more about the challenges facing the subcontracting industry in 2019, and beyond, read Bibby Financial Services’ subcontractor growth report here.

The post The state of the subcontracting industry: How can Bibby Financial Services help? appeared first on UK Construction Online.


Building homes that are fit for the future

As floods swept eastern England earlier this year while temperatures in France reached an all-time high of 45.6 degrees Celsius, and the UK experiencing some of its highest recorded temperatures in history, humans’ impact on climate change is very much at the top of the national and international agenda. Earlier this year, energy-inefficient homes were identified as damaging efforts to tackle climate change. With the goal of making Britain carbon neutral by 2050, the ‘Future Homes Standard’, due in 2025, is set to enforce minimum environmental standards for all new housing.

At the time of the report’s publication in February 2019, reductions in emissions from the UK’s 29 million homes appeared to have stalled, while energy use in homes – which accounts for 14% of total UK emissions – had increased between 2016 and 2017.

In already unstable political and economic times, these changes are set to have a marked impact on the construction industry’s future approach, so how can the industry ensure that the next generation of UK housing ticks all the environmental boxes?

Across the country, housebuilders and developers are currently grappling with the need to increase the number of homes available, while ensuring that quality remains high. The introduction of the Future Homes Standard, which emphasises the need for alternative energy installations and the use of low-carbon materials, only drives the need for organisations to continue striving for better standards across the board.

With this in mind, the industry has reached a critical point where housebuilders must decide between providing less sustainable dwellings, or good quality homes that can be adapted to suit the needs of an increasingly diverse population. This should be an easy decision; after all, the principles set out in the new standards reflect best practice. Yet, historically, budget constraints have been an issue, resulting in homes falling short of necessary standards and more money having to be spent retrofitting these short-term housing solutions for long-term use.

The Future Homes Standard presents several key challenges for the construction industry and housebuilders, principally, the need for homes that reflect the needs of a varied market. Unlike the UK’s European counterparts, who have diversified their housing stock to suit the changing requirements of the population, homes in the UK are still mostly built to suit the average 2.2-person family and leave little room for more modern family structures or living arrangements.

Times have changed and the modern-day market now requires far greater flexibility than ever before. Recent reports have highlighted the need for safe and comfortable homes for the elderly, while students and young professionals search for flexible, modern spaces that suit their immediate needs.

The Future Homes Standard offers developers and housebuilders the exciting opportunity to redefine the housing market, providing a greater spread of properties that are designed with adaptability in mind. Should the sector bring these factors together, there is huge opportunity for change.

The UK housing market is notoriously slow to adapt; therefore, these standards require a huge leap of faith from most developers, particularly for the ‘big players’ in the sector. From the supply and use of new materials – all of which will require rigorous health and safety testing – to the development of new skillsets, the changes are likely to present several initial challenges.

Yet, certain areas of the market which are being driven by increasing demand, such as the private rental sector and later living market, also present significant opportunities to embrace innovation and take a new approach to housing. This is true both in terms of the design standard and build specification.

This increase in quality will likely be reflected in the price of the homes on offer; some schemes with exceedingly tight margins, which are only just viable at the moment, may become increasingly difficult to deliver, and sell, under the new standards.

Consequently, the UK government must provide a solution that is more carrot than stick, starting with a material reduction of Stamp Duty on homes that meet the new standards. With a less-than-exemplary track record when it comes to the support of alternative energy sources, the Government must deliver consistent, balanced messages and engage in giving back in economic terms. While many in the industry may wish to change their approach to sustainable building, they are unlikely to do so very quickly.

Previously, some contractors may have perhaps shied away from building to the highest possible standards due to the costs incurred. However, the solutions proposed by the new standards and the Government must no longer just be aspirational, they must be deliverable. Critical factors such as supply chain, recognising the necessary skill sets and the costs involved must all be well considered.

Merely producing the standards and walking away will not work this time. Instead, the standards must be developed in conjunction with innovative thinking, financial incentives, and industry-wide consultation.

To ensure that UK housing is fit for the future, it mustn’t be forgotten where the industry was in the past, and what it needs to do to move forward – the days of cutting corners are long gone. The Government and housebuilders must now work together to embrace change and share the costs involved, where possible. If done well, the Future Homes Standard offers an opportunity to completely reimagine housing, from the ground up.

 

Article submitted by Martin Jones, partner and head of the projects and infrastructure group at law firm, Shakespeare Martineau.

The post Building homes that are fit for the future appeared first on UK Construction Online.