A rounded approach to sustainability

The circular economy as a phrase has become ubiquitous across the construction and manufacturing industry. Although somewhat overused, the concept has radically transformed our industries’ methods and practices over the past decade.

With environmental concerns now a key driver along with capital costs, flexibility will be crucial whether we are building from scratch or renovating existing sites. It’s clear we should be concentrating on building for future retrofit, not future demolition[1].

The circular economic model offers a clear and definitive pathway, particularly for manufacturers of building products, to achieve this goal. At the Concrete Block Association (CBA), sustainability is at the heart of our members’ business strategy as they look to ‘reduce, reuse, recycle and recover’ energy from procurto end-of-life and beyond.

We know that intrinsically, concrete structures are highly durable, a fundamental requirement for whole-life performance. Yet concrete also possesses unique attributes which minimise CO2 emissions. When specified correctly, concrete blocks can significantly minimise embodied CO2. The material’s thermal mass qualities are therefore advantageous, as they can also greatly reduce the operational emissions from heating and cooling a building, without compromising on comfort.

This is just one way in which our members are indirectly making a contribution to the move towards a greener, more eco-friendly built environment. However, there are more proactive, direct ways in which they are looking to promote. Here, I want to take the opportunity to outline some of the activity which is being undertaken to foster best practice within the building products manufacturing industry, and the benefits for the built environment.

Material values

One of our greatest success stories over the past decade has been to significantly reduce CO2 emissions associated with the production of concrete blocks. A remarkable reduction of 13% carbon intensity since 2008 has been made possible through improvements to the manufacturing process. Furthermore, the impact of emissions through transportation, associated with a number of building products, are reduced as the majority of blocks produced in the UK are made in local product plants ensuring local deliveries, thus reducing the carbon footprint.

Of course, cement accounts for the majority of a block’s environmental impact. However, while it remains an important part of the composition, manufacturers are blending other lower impact cementitious materials with it, consequently reducing the overall embodied CO2. These more environmentally friendly substances are industry by-products; ground granulated blast furnace slag (GGBS) and fly ash from the power industry being the two most commonly used.

Mass appeal

While adapting our approaches to a changing climate, we should also build with materials which make for comfortable homes. Using building products which provide inertia against temperature fluctuations will improve energy efficiency and help homeowners by potentially reducing energy bills.

A concrete block’s thermal mass is one of the most important ways in which the whole life CO2 performance of buildings can be enhanced. They absorb and store excess heat during the day, which can be removed passively overnight through ventilation.

It’s essentially an alternative method of temperature control, allowing a structure to naturally retain heat and release it gradually, minimising the need to resort to air conditioning or central heating.

The second coming

It’s important to look beyond the initial end-of-life. A crucial aspect of the circular economy is to find ways to reuse and recycle products, reimagining them beyond their lifespan. For concrete blocks this could be in groundworks, piling mats and landscaping. Equally they can be crushed and used as recycled aggregate. Clarifying our commitment to secondary life, our members have publically pledged that all blocks they manufacture are 100% recyclable.

Deconstruction and waste processing at the end of a building’s life results in more CO2. Therefore we all have a responsibility to improve how building products are manufactured and specified for construction.

As part of our ongoing work, the CBA is actively encouraging producers to introduce measures to reduce energy consumption, eliminate waste and implement environmental and sustainable management systems beyond what is required by government.

Lean and flexible design

Beyond manufacturing, the architectural and wider construction industry need to also be on board for the Circular Economy concept to work. We need to hammer home the message of material efficiency and lean design; using less of our resources and to better effect.

Rapidly improving technology and innovation are enabling us to work smarter and more efficiently. For example we are now able to ascertain the optimal thickness of structures needed for best energy efficiency.

Essentially, flexibility must be built in so the building can assume new uses, incorporating new technologies and changing climactic conditions. There’s a long way to go until the construction and manufacturing industries are truly ‘circular’, but we are taking great steps towards it. Even in these economically uncertain times we need to maintain momentum, and we’ll thank ourselves for this effort further down the line.

Article submitted by Chris Stanley, Housing Manager, Concrete Block Association

[1] Simon Sturgis article

If you would like to read more articles like this then please click here.

The post A rounded approach to sustainability appeared first on UK Construction Online.


Glenigan predicts the future of construction under Conservative leadership

According to recent projections by Glenigan, in their forecast for construction under Conservative leadership 2020-2021, the value of underlying construction starts in Britain is expected to grow by a proportion of one per cent by the end of 2019, increasing to two per cent growth by the end of 2020, and five per cent growth by the end of 2021.

Breaking this down by way of each sector, it can be seen that construction projects within the retail and office sectors will initially benefit from Conservative leadership, with the value of underlying construction project starts within these two sectors expected to increase by one per cent and six per cent respectively by the end of 2019.

Furthermore, the underlying value of project starts within the hotel and leisure sector are likewise expected to do well over the longer term, increasing by a proportion of one per cent by the end of 2020 and by five per cent by the end of 2021, with many economists attributing this to a lowering value of the pound making Britain a cheap, popular tourist destination.

Adding to this, the value of underlying projects within the education and health sectors are expected to increase over the long-term after suffering a poor start, with the value of starts expected to decline by a proportion of nine per cent and 12 per cent respectively by the end of 2019 before increasing by four per cent and eight per cent respectively by the end of 2021.

Strangely, however, major projects and infrastructure are expected to fluctuate under Conservative leadership as the underlying value of projects within the civil engineering sector are expected to dramatically increase by a proportion of 22 per cent by the end of 2019 but will fall to just five per cent by 2020 and will remain unchanged by 2021.

If you would like to read more articles like this then please click here.

The post Glenigan predicts the future of construction under Conservative leadership appeared first on UK Construction Online.


Environment Agency undertakes flooding repairs

The Environment Agency has undertaken urgent repairs on flooding embankments in Lincolnshire at the start of the month following a period of heavy rainfall and extreme weather which caused major flooding in parts of Lincolnshire, Yorkshire, and Derbyshire.

The Environment Agency had to undertake said repair work using specialist equipment at various locations in order to reclaim and protect agricultural land, homes, and businesses which had been affected by the autumn floods.

Equipment such as pontoons and amphibious diggers we deployed at sites such as Barlings Eau in order to allow teams to install 40m of piling in the bank so that once conditions improved water could be pumped from agricultural land.

In addition to this, repairs were also undertaken at Timberland Delph where Environment Agency teams placed 100 one tonne sandbags in positions to reduce any further damage while repairs were also undertaken at Witham River, Ancholme River, The Brant Reservoir, Till Reservoir, Market Rasen Reservoir, Freshney Reservoir, Louth Reservoir and Horncastle Flood Reservoir.

The Environment Agency Area Director, Norm Robinson stated: “Despite the extreme rainfall that pushed our rivers to their limits – and the fact that a third of Lincolnshire is below sea level – the vast majority of homes, businesses and land has remained safe from flooding. In fact, less than one per cent of the county’s agricultural land has been affected.

“But we know how devastating flooding can be for those affected, which is why we are completing repairs as quickly as possible. This work will have to be done in stages, but throughout the process, we’ll continue working closely with the IDBs and the NFU, and we are in near daily contact with the landowners affected, giving advice, guidance and updates on our progress.”

If you would like to read more articles like this then please click here.

The post Environment Agency undertakes flooding repairs appeared first on UK Construction Online.


Expansion planned for the All Wales Adult Cystic Fibrosis Centre

The Welsh First Minister, Mark Drakeford, recently announced the government’s intention to allocate £4.7M for the redevelopment of the All Wales Adult Cystic Fibrosis (CF) Centre at the University Hospital in Llandough.

This funding from the Welsh Government will be used to both redevelop and expand the All Wales Adult Cystic Fibrosis Centre which, upon it’s original construction in 1997, was a nine bed facility but was recently reduced to a seven bed facility in line with revised care guidelines on infection control. However, recent demand for care of this condition has outgrown the facility’s capacity.

The redevelopment works themselves will involve the refurbishment of existing facilities as well as the increased capacity of the centre to 16 beds with additional features such as new gymnasium rooms, treatment rooms, and enhanced mechanical and electrical services with work scheduled to commence in the January of 2020 and continue until November 2020 so that the centre can be reopened in the December.

Minister Drakeford stated: “Everyone receiving care for complex illnesses like those here at the remarkable CF centre, should be able to do so in a safe and supportive environment.

“Nobody enjoys a hospital stay but if we can make that stay as comfortable, safe and as focused on the needs of the individual as possible, then this will have benefits for them, their families as well as those providing that care.”

This recent sum of funding has been dedicated to the centre after the Welsh Government confirmed that all eligible people with Cystic Fibrosis (CF) in Wales will be able to access Orkambi® and Symkevi® medications to treat the condition which causes a build up of mucus in the lungs and digestive tract, causing people to have difficulty with breathing.

If you would like to read more articles like this then please click here.

The post Expansion planned for the All Wales Adult Cystic Fibrosis Centre appeared first on UK Construction Online.


The UK construction industry responds to the General Election result

Following the result of the General Election, various construction companies have expressed a relief in thinking that a definitive majority government could bring an end to the uncertainty that has gripped Parliament over the past three years.

Though the majority of responses to the General Election have been mixed, the consensus, so far, has been that companies are relieved that the political gridlock might end but are warning the Conservative Government that trade deals need to me made and support needs to be given to builders.

The Chief Executive of the Federation of Master Builders, Brian Berry stated: “The new Conservative Government has a golden opportunity to sort out Brexit and set out its new vision for the UK. Building the homes and infrastructure that this country needs has to be a key priority to help drive the economy forward.”

“The Government needs to back the nation’s army of small builders, by delivering on the promised £3Bn National Skills Fund, investing in quality through a licensing scheme for the whole UK construction industry, and supporting local builders to retrofit the millions of homes that need to be upgraded to low carbon.”

Regional building companies have likewise stressed that peripheral regions cannot be neglected and neither can the government’s previous pledges of establishing a ‘Construction Corridor’ in the North of England.

The Director at Caddick Group, which operates primarily within Yorkshire and the North West, Johnny Caddick added: “This result – and the political need to now fully support the North with world class infrastructure – will bolster confidence in regional economies which will enable more capital to flow into housing.

“The increase of skilled jobs – and the emergence of new businesses that can re-skill workers will be a magnet for employers and housing development. And with institutional finance continuing a global hunt for yield, the market will be looking positively towards build to rent opportunities in 2020.”

If you would like to read more articles like this then please click here.

The post The UK construction industry responds to the General Election result appeared first on UK Construction Online.


Biyernes, Disyembre 13, 2019

Insolvency in the construction sector

In the past five years, insolvency rates in the construction industry have increased more quickly than in other industries across the UK. This article considers the common causes of construction insolvency and how to protect your position if insolvency occurs.

Recent trends

The term ‘insolvency’ indicates a company’s inability to pay debts as and when they fall due or (from a balance sheet perspective) the value of a company’s liabilities being greater than the value of its assets. Each can result in a company being placed into liquidation or administration. The aim of these processes is to recover all available assets, enabling them to be disposed of to generate proceeds which can be distributed to creditors to satisfy their debts.

Records in the 12 months to the end of September 2018 saw 2,954 construction insolvencies out of a total of 17,439 insolvencies – which represents a 12% increase on the previous year. Even large construction companies have struggled – as demonstrated by the collapse of a major contractor in 2018.

Reasons for construction insolvency

In the construction industry there is usually a delay between work being performed and payment being received. Most contracts provide for stage payments in arrears, resulting in the supply chain carrying significant work in progress until it is paid. This lag in monetary recovery can result in businesses suffering cash flow issues because they have to wait up to 90 days or more for invoices to be paid, or because in some cases (for various reasons) they may not be paid at all. Late payments and bad debts are the main triggers for insolvency.

Lack of profitability can also affect construction businesses of all sizes. The sector contributes approximately 7% of GDP meaning it is a large industry, and therefore a highly competitive industry. Tenders are often decided on a price metric meaning the lowest price often wins the work. This can result in contractors performing work with minimal margins. Any unexpected delays or increased costs in the works which the contractor has to bear (such as higher material costs, currency fluctuation risks and rising labour costs) can wipe the profit from the work. In light of the pressure to ensure a job is profitable, combined with any cash flow issues as mentioned above, disputes can emerge regarding payment and valuations – otherwise again the business can be at risk of insolvency.

Finally, the domino effect reflects the impact which one party higher up the chain becoming insolvent can have on others, such as a main contractor on a subcontractor. The failure of one business can have repercussions for others in the chain who were reliant on the income from the project to fund their works.

The Courts’ interpretation of ‘insolvency’

When determining ‘insolvency’ the Courts construe it strictly in accordance with its definition in the contract, even if the contract refers to an out of date or non-exhaustive list of insolvency processes.

At common law, insolvency by itself is not a breach of contract. However its effect can result in a repudiatory breach of contract which means the contract could be ended regardless of whether or not the contract contains any termination provisions.

Under the Insolvency Act 1986, a company is ‘insolvent’ when it is unable to pay its debts as and when they fall due for payment. In contrast, under clause 8.1 of the JCT Standard Building Contract, a party which is a company is taken to be ‘insolvent’ for the purposes of the contract where a recognised insolvency procedure has been invoked, such as where the company has passed a winding up resolution or the company has entered into an arrangement or compromise of its debts with its creditors. Consequently, under the JCT contract the fact that the company is unable to pay its debts as and when they fall due is insufficient for it to be ‘insolvent’ contractually, though this may ultimately lead to a formal insolvency procedure being invoked so as to make the company ‘insolvent’ for the purposes of the contract. Therefore the status of the insolvency needs to be considered, in addition to ensuring all parties follow the proper contractual formalities, to avoid any claim for wrongful termination if insolvency is relied on to terminate a contract.

The insolvency termination provisions (under the JCT Intermediate Building Contract with Contractor’s Design 2011) came under scrutiny in Wilson and Sharp Investments Ltd vs Harbour View Developments Ltd (2015).

That case considered whether the insolvency provisions applied in all situations of insolvency or just those where insolvency occurs prior to termination of the contract and the contract is terminated as a result. The issue was relevant because the contractor (Harbour View) became insolvent after termination had occurred. If such provisions did not apply where the contract had previously been terminated by the contractor, then insolvency clause allowing the employer to suspend payments to the contractor would not apply.

The case went all the way to the Court of Appeal which confirmed that the ‘insolvency’ provisions applied, regardless of whether the insolvency occurred prior to or after termination and regardless of whether termination was due to the insolvency. This decision was favourable to the employer rather than the contractor. The Court confirmed that the JCT provisions complied with the Housing Grants and Construction Regeneration Act 1996,(the Act) section 111(10) and even the JCT provisions that came under the heading “termination” applied irrespective of whether the contract was terminated or capable of termination by reason of contractor insolvency. The decision confirms if contractor insolvency occurs at any time, under the JCT the employer is not obliged to pay sums due under interim certificates. Instead, payment is delayed until the final account, regardless of whether the employer issued a pay less notice. The position is the same under the 2016 edition of the JCT.

Warning signs of insolvency

There are many early warning signs that an employer, contractor or subcontractor could be facing financial difficulties, which include:

  1. Cash flow issues
  2. Late/non-payment of supply chain invoices/employees’ wages
  3. Attempts to negotiate changes in payment terms such as renegotiating credit limits
  4. Persistent rumours within the industry about their financial position
  5. Late filing of accounts or annual returns at Companies House
  6. Unsatisfied court judgements, County Court Judgements or High Court Writs being issued against them
  7. Creditors issuing winding up petitions
  8. Official announcements to shareholders/the market regarding financial performance
  9. Suspension of work without explanation or surprising/uncommercial omissions from a project
  10. Personnel removed from the project unexpectedly.

Protection methods in advance of insolvencies

To reduce the risk of insolvency, parties should consider the following when negotiating contracts:

  1. Obtaining references / credit checks. Auditing the other party’s financial status at the time of contract negotiation can be a good indicator of future performance.
  2. Pay when paid clauses. Generally these clauses are prohibited under the Act. However, there is an exception to the prohibition in the event of ‘upstream insolvency’, so that a paying party does not have to pay if its own payment is withheld due to insolvency. This requires specific drafting in the contract.
  3. Retention of title clauses. These can enable an unpaid party to get back goods/materials belonging to them prior to full payment being made. However, the clauses need to be properly drafted, and title to goods often passes to the buyer when the goods have been incorporated into the building / attached to the land even if the supplier is unpaid.
  4. Collateral warranties. These create a direct contractual relationship between the contractor’s, consultants or subcontractors and the employer – by which the consultant or subcontractor warrants to the employer that it has complied with its appointment/subcontract. This enables the employer to pursue them for defects despite not directly appointing them.
  5. Parent company guarantee (PCG). The contractor’s parent company can guarantee the performance of the contractor in the event of its insolvency. The PCG will make the parent company liable for any amounts due to the employer at any point in time if the contractor does not complete the works. The parent company may remain financially viable and hold additional assets. However the PCG will often only pay out on completion of the building works so that the value of the claim is easily quantifiable which may limit its use. A bond can also or alternatively be used to protect the employer.
  6. Third Party (Rights Against Insurers) Act 2010. This legislation enables claimants to bring proceedings against the insurers of defaulting insolvent companies. This may assist an employer if latent defects arise after practical completion at a time when the contractor has become insolvent as the defects may be covered by the insurance policy.
  7. Suspension/termination clauses. Including a clause permitting suspension of performance or termination of the contract in the event of the other party’s insolvency can protect a party, but care needs to be taken in the drafting to detail the parties’ rights and the effect of termination on the contract, and to ensure the definition of “insolvency” is sufficiently wide.
  8. Communication is key. As a creditor, any debtor must consider your interests when experiencing cash flow issues. Arranging agreements with debtors that spread payments can help avoid insolvency occurring. If insolvency occurs, parties can negotiate with Insolvency Practitioners to reach mutually agreeable solutions such as ensuring works are completed, and the site is secured.
  9. Records. Maintaining proper records demonstrating the losses arising out of the insolvency (such as recording what materials and equipment are on site, especially what has been paid for) can help safeguard a party’s interests if insolvency does occur.
  10. Dispute Resolution. Initiating an adjudication prior to the other party becoming insolvent can mean the difference between securing payment prior to the insolvency and ending up in the queue of unsecured creditors. Always consider formal dispute resolution options prior to impending insolvency as adjudication cannot be pursued against a company in liquidation/administration.

Insolvency can affect all businesses regardless of turnover. If you would like advice on a construction insolvency issue please contact a member of the Construction team at WBD.

If you would like to read more articles like this then please click here.

The post Insolvency in the construction sector appeared first on UK Construction Online.


Trinity College to construct new building

The construction and fitting-out company Gilbert-Ash Construction have been contracted by Trinity College, a constituent of the University of Oxford, to carry out the construction of a new £17M mixed-use building.

The Trinity College development will consist of 45 new ensuite study bedrooms, five dedicated teaching rooms, three multi-purpose areas for music practice, further teaching rooms, a basement for plant and storage, formal study spaces, a new reception area, two additional student kitchens, a laundromat, as well as male, female, and gender-neutral bathrooms.

Gilbert-Ash Construction and Adam Architecture have collaborated on the design of the new college building which will feature stone-faced elevations finished in a honey coloured ashlar limestone in order to blend in with other buildings on and around the college campus.

The construction of this new mixed-use building at Trinity College will be the first building works to be undertaken at the Oxford site in more than 50 years, with completion scheduled for the August of 2021, ahead of the 2021/2022 academic year which will commence in the September.

The Gilbert-Ash Construction Director, Raymond Gilroy stated: “Gilbert-Ash is really pleased to be working on this major project for Trinity College. We are excited about the new building and what it will offer to the university community.

“We are in no doubt about the challenges which lie ahead, working in a tight location surrounded by listed buildings and grounds, but our team has the experience to meticulously plan for and work through any challenges which present themselves.

“We are ready to roll up our sleeves and work with our partners to deliver this prestigious project.”

Gilbert-Ash was appointed to this project following the successful construction of a new accommodation development at Wadham College, another constituent of the University of Oxford.

If you would like to read more articles like this then please click here.

The post Trinity College to construct new building appeared first on UK Construction Online.